Webasto Thermo Top C - PME Operations Instructions Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
Fuel connection Thermo Top C / Thermo Top E
42
8.5. Connecting two pipes and a hose
The correct procedure for connecting fuel lines with hosing is illustrated
in Fig. 9.
Ensure that there are no leaks!!
8.6. Metering pump
The metering pump is a combined delivery, metering and shutoff system
and is subject to specific installation criteria (see Figs. 7, 10 and 11).
8.6.1. Installation position
Before installing the metering pump, ensure that the maximum pressure
occurring at the pickup point is less than 0.2 bar.
It is advisable to install the metering pump in a cool place. The
permissible ambient temperature must not exceed +20 °C at any time
during operation.
Metering pump and fuel lines must not be installed within range of
radiated heat from hot vehicle parts. A heat shield must be used if
applicable.
The pump should preferably be installed near the tank.
Fig. 9: Pipe / hose connection
Clip
Bubble
Right
Wrong
Bubble
Fig. 10: Metering pump DP 2
Installation position
Fig. 11: Metering pump DP 30
Installation position
Thermo Top C / Thermo Top E - petrol
15° - 90°
Preferably
Thermo Top C / Thermo Top E - diesel
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 27 28

Comments to this Manuals

No comments